Pharmaceutical warehouse · Phased handover
GlaxoSmithKline MMC, Harlow
HTC Superfloor Platinum for a new pharmaceutical warehouse, with areas released in phases for racking installation.
View project ↗Project capability
Directly operated grinding equipment, experienced installers and one accountable team from preparation through to handover.
Completed Ecoflor projects

Pharmaceutical warehouse · Phased handover
HTC Superfloor Platinum for a new pharmaceutical warehouse, with areas released in phases for racking installation.
View project ↗
Retail refurbishment · 600 m²
An existing warehouse and office slab prepared and diamond polished for a 600 m² retail store.
View project ↗
Automotive manufacturing · Nearly 8,000 m²
Removal of historic resin paint and HTC Superfloor polishing across nearly 8,000 m² of an existing industrial building.
View project ↗
Retail refurbishment · 600 m² · 8 days
Adhesive removal, densification and a seven-stage polishing process for a 600 m² retail floor, completed in eight days.
View project ↗Complete in-house service

Industrial delivery
Installation can be coordinated around new-build handovers, phased refurbishments and operational constraints. Dust-controlled preparation and directly controlled machinery help maintain quality across large areas.
Discuss programme + area ↗What we assess
Surface hardness, contamination, coatings, repairs, cracking and likely visual results.
Concrete mix, finishing, curing, protection and coordination with polishing works.
Traffic, cleaning, slip considerations, reflectivity and return-to-service.
Project planning

Confirm slab design, placing sequence, curing, joint layout and protection before fit-out trades arrive.
Plan a new slab ↗
Record coatings, contamination, weak zones, repairs and likely aggregate exposure with representative trial areas.
Assess an existing slab ↗
Agree sample size, colour range, sheen, edge detail and care before procurement.
Review finish options ↗Handover
A flooring programme should include cure time, protection by following trades and a cleaning method appropriate to the final surface. Where work is phased, agree interfaces and acceptance checks for each area before the next stage begins.
Discuss your project ↗Share your project